A 2 man team to attended site to carry out the following:
Remove existing doors and frame.
Supply, construct and install a new timber frame.
Supply and fit solid core double doors into new frame with new hinges.
Install double door panic bar set on the inside of the new doors.
Supply and fit an outside access mechanical code lock
Doors to be primed and painted black
Test operation of doors
RECENT JOBS
Malfunctioning Lock
Our reactive team responded to an urgent situation as the front door to a commercial office could not be closed due to a malfunctioning lock and presented a security risk . The lock was adjusted and the problem was resolved.
Refurbishment
Our refurbishment team attended and replaced missing plasterboard and filled as required and painted entire wall in white emulsion.
Brickwork Repair
Following the identification of a pillar in disrepair our reactive maintenance team attended site. They toothed out all broken brick work in the pillar and re-layed new bricks to rebuild the pillar.
Ground works post H&S review
Our groundwork team attended to repair broken paving slabs. This was following a heath and safety review which had identified them as slip hazards.
FRA Response
Our maintenance team attended a central London office to deal with recommendations post a Fire Risk Assessment. One of which was to relocate the fire extinguishers.
Groundworks
Our groundworks team reset and concreted in two bollards at an industrial site where HGVs had been colliding with the bollards previously.