A 2 man team to attended site to carry out the following:
Remove existing doors and frame.
Supply, construct and install a new timber frame.
Supply and fit solid core double doors into new frame with new hinges.
Install double door panic bar set on the inside of the new doors.
Supply and fit an outside access mechanical code lock
Doors to be primed and painted black
Test operation of doors
RECENT JOBS
Relay block paving
Following a health and safety review that identified a number of slip hazards our groundworks team attended and relaid the block paving round a manhole cover.
Christmas tree installation
Our reactive Elves team purchased a number of Christmas trees and decorations for a large commercial building in Cambridge. Trees were then installed and decorated.
Temporary roof repairs
Our roofing team carried out temporary commercial roof repairs to a commercial building prior to more substantive replacement in the next financial year. EPDM and liquid resin were applied.
Decorating and refurbishment
Our decorating team attended and repainted a complete flat for an investment landlord prior to new tenants moving in.
Lock replacement
Our locksmith attended a commercial building in order to replace a lock so that there was a thumb turn on the inside to allow people to exit the building without a key.
Relay paving stones
The groundworks team attended a retail park where damaged paving stones represented a trip hazard and relaid.