A 2 man team to attended site to carry out the following:
Remove existing doors and frame.
Supply, construct and install a new timber frame.
Supply and fit solid core double doors into new frame with new hinges.
Install double door panic bar set on the inside of the new doors.
Supply and fit an outside access mechanical code lock
Doors to be primed and painted black
Test operation of doors
RECENT JOBS
Road Resurfacing
Road resurfacing at health club by digging out arisings laying concrete and then a top covering of tarmac.
Installation of ramp
Installation of ramp at office building as part of planned maintenance review following a heath and safety audit.
Installation of wooden fence replacement
Carpentry and security requirement - installing a wooden fence to prevent access to the site through a hedge by third parties.
Refurbishment
Refurbishment of central London office as part of a planned maintenance schedule. Decorating of walls and all wood.
LED Installation
Planned maintenance at an industrial trading site. Electrical installation to replace all existing light fittings with LED light fittings.
Height Restrictor
As part of a planned maintenance schedule we fabricated and fitted a height restrictor at a retail park to improve traffic management.








