A 2 man team to attended site to carry out the following:
Remove existing doors and frame.
Supply, construct and install a new timber frame.
Supply and fit solid core double doors into new frame with new hinges.
Install double door panic bar set on the inside of the new doors.
Supply and fit an outside access mechanical code lock
Doors to be primed and painted black
Test operation of doors
RECENT JOBS
Carpark Refurbishment
Refresh of car park at commercial building.
Cleaning of External Areas
Cleaning and repair of external areas at commercial offices.
Traffic Control
Installation of traffic control signs at commercial site.
Stainless Steel Bollards
Fitting of bollards to protect pedestrian access to Marks and Spencer at retail center.
New Concrete Level
Repair of pavement after Health and Safety review to ensure no trip hazards.