A 2 man team to attended site to carry out the following:
Remove existing doors and frame.
Supply, construct and install a new timber frame.
Supply and fit solid core double doors into new frame with new hinges.
Install double door panic bar set on the inside of the new doors.
Supply and fit an outside access mechanical code lock
Doors to be primed and painted black
Test operation of doors
RECENT JOBS
Roof and gutters
There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate.
Installation of bollards
Our groundworks team attended a prestigious residential develop and installed suitable bollards to prevent unauthorised vehicle access.
Mold treatment & redecoration for retail unit
Our team attended retail unit that had been effected by mould and staining and redecorated.
Boiler Installation
Our plumbing and heating team attended a retail premises in order to install a boiler
Replacement of entry barrier
Our team urgently attended an industrial site due to a broken entrance barrier
Installation of fire exit
A 2 man team removed the existing structure to create a new fire exit.