Our planned maintenance team attended a commercial building following a FRA in order to: install 3 hand rails from galvanised steel poles fixed into brackets fixed to the wall either side of the riser
Install signage to new rails “No access”
Install signs on insulation stating “Do not stand here”
RECENT JOBS
Picnic facilities
Our reactive maintenance team attended a commercial premises in order to urgently install a picnic table so that people were able to take advantage of the weather.
Replacement of kerbs stones and paving slabs
Our planned maintenance team went to an industrial park to break out damaged 3 kerb stones and 2 paving slabs that were a potential health and safety hazard...
Fabrication and replacement of swing gate
Our planned maintenance team attended an industrial centre for fabrication and replacement of a swing gate
Kerb repair
Our groundworks team attended a commercial centre in order to repair damaged kerb stones on an access road.
Roof repair
Our reactive maintenance team attended a commercial property in order to repair a flat roof after water ingress and been noticed.
Step nosing
Our planned maintenance team attended a commercial site in order to highlight a potential hazard identified by a health and safety report.