Our planned maintenance team attended a commercial building following a FRA in order to: install 3 hand rails from galvanised steel poles fixed into brackets fixed to the wall either side of the riser
Install signage to new rails “No access”
Install signs on insulation stating “Do not stand here”
RECENT JOBS
Fire door replacement
Our reactive maintenance team attended a West End office building in order to replace a fire door.
Block paving repair
Our groundworks team attended an office centre after a number of heavy goods vehicles had damaged the block paving.
Repair of brickwork
Our reactive maintenance team attended a business centre in order to repair a damaged wall.
Replacement glass unit to office conservatory
Our planned maintenance team attended a commercial office in order to replace the damaged glazing on an internal conservatory.
Access door repair
Floor spring and bottom shoe replacement of door
Re-lay of slabs
Two man groundworks team attended a central London commercial location.