2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy
RECENT JOBS
Fire door adjustment
Building fabric team attended a commercial premises in order to attend to a fire door that was unable to close property.
Groundworks
The groundworks team attended a business park in order to re-lift uneven slabs, throw away broken ones as required and relay slabs
Decoration
Our refurbishment team attended an office building in order to refurbish a board room.
It’s getting to feel a lot like Christmas…
Our electrical team attended a retail park and installed commando sockets in the lampposts along the entry drive way in anticipation of the installation of Christmas lights
Redecoration
Our planned maintenance team attended a premier Mayfair office - repainted all walls and ceilings in common areas out of hours.