2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy
RECENT JOBS
Fire escape route clearance
Attended site in order to sweep both fire escapes on both sides of the building to clear all litter and leaves
Line Marking
Our team attended an office park in order to apply thermostatic road markings
Electrical inspection and repair of external lighting
Our electrical team attended an industrial park in order to inspect and repair as necessary the external lighting.
Leak repair
Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
Vanity unit refurbishment
Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage.
Electrical Installation
Our electrical team attended a central London commercial building for an installation.