2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy
RECENT JOBS
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.