Installation of muster point post

Installation of muster point post

2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy