2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy
RECENT JOBS
Gully Replacement
A planned groundworks job to replace broken and loose gully slabs.
Refurbishment of Fire Exit
A planned maintenance job in response to a fire risk assessment.
Tarmac Repair
Planned maintenance in response to a health and safety review.
Clearing of Moss and Algae
Planned maintenance in response to health and safety review.
Groundworks Retail Park
Planned maintenance including groundworks, signage and drains.
Health and Safety Survey Response
Planned maintenance in response to a health and safety survey.