2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy
RECENT JOBS
Refurbishment of disabled toilet.
Refurbishment of disabled toilet.
Emergency Repair of Bollard
Emergency repair of bollard hit by a vehicle.
Tiling of Bathroom
Tiling of Bathroom
Rubbish Removal
Safe removal of rubbish.
Installation of Microwave Sensors
Installation of microwave sensors on stairs.
Hazard Strips
Installation of hazard strips to ensure that health and safety issues don’t occur in plant room.