2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy
RECENT JOBS
Cleaning of External Areas
Cleaning and repair of external areas at commercial offices.
Traffic Control
Installation of traffic control signs at commercial site.
Stainless Steel Bollards
Fitting of bollards to protect pedestrian access to Marks and Spencer at retail center.
New Concrete Level
Repair of pavement after Health and Safety review to ensure no trip hazards.
Quarterly Refurbishment – Retail Park
Quarterly visit including electrics - signs and trip hazards.