2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy
RECENT JOBS
Gutter Clearance
It is obviously important that gutters are kept clear in autumn to prevent water ingress.
Fire Strips
Installation of intumescent strips on fire doors post a Fire Risk assessment.
Refresh of external entrance areas
Pressure washing and sealing of cracks can give external areas an aesthetic uplift.
Rubbish Removal
It is important that fly tipping or other on site eye sores are removed as quickly as possible.
Commercial Building Refrubishment
Complete external refurbishment of 4 story commercial building.