Installation of fire doors – SPA have a number of years experience of responding to Fire risk assessments and Health and Safety surveys.
RECENT JOBS
Paving replacement
Our groundworks team attended an office building in response to a health and safety audit.
Installation of barrier and hoop barriers
Our groundworks team attended an industrial site in order to install and test road barrier
Bike shelter construction
Our groundworks team attended a commercial site to install 6m cantilever cycle shelter.
Refurbishment of external areas
Our planned maintenance team attended a commercial property to refurbish some of the outside areas.
Plumbing Installation
Our plumbing team attended a commercial building in order to adapt existing pipework, install a cold water feed tape and adapt the waste removal pipe in order to allow the installation of a a dishwasher.
Roof Edge Protection
Our preventive maintenance team attended a commercial building as a health and safety report had indicated that the roof edging should be increased in height. Using safety harnesses the team dismantled the existing structure and resembled to meet the height requirement.