Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘
RECENT JOBS
Replacement glass unit to office conservatory
Our planned maintenance team attended a commercial office in order to replace the damaged glazing on an internal conservatory.
Access door repair
Floor spring and bottom shoe replacement of door
Re-lay of slabs
Two man groundworks team attended a central London commercial location.
Replacement of manhole cover
Our groundworks team attended an industrial estate in order to replace a gas cover.
Decorating of investment property
An investment property as part of a client portfolio was attended by our planned maintenance team.
Repair of fire escape gate
Our reactive maintenance team attended an industrial park in order to repair a gate that was unable to open - the gate also acts as a fire escape route