Planned maintenance at an industrial trading site. Electrical installation to replace all existing light fittings with LED light fittings.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2019-08-05T22:04:16+02:00
Go to Top