Our planned maintenance team attended a business park in order to address a potential health and safety hazard caused by uneven slabs. They:
Lifted slabs
Cleaned
Created level base using sand
Relayed existing slabs ensuring level
Swept areas upon completion
RECENT JOBS
Block paving repair
Our groundworks team attended an office centre after a number of heavy goods vehicles had damaged the block paving.
Repair of brickwork
Our reactive maintenance team attended a business centre in order to repair a damaged wall.
Replacement glass unit to office conservatory
Our planned maintenance team attended a commercial office in order to replace the damaged glazing on an internal conservatory.
Access door repair
Floor spring and bottom shoe replacement of door
Re-lay of slabs
Two man groundworks team attended a central London commercial location.
Replacement of manhole cover
Our groundworks team attended an industrial estate in order to replace a gas cover.