Our locksmith attended a commercial building in order to replace a lock so that there was a thumb turn on the inside to allow people to exit the building without a key.
RECENT JOBS
Boarding Up
Emergency call out to board up broken window on 3rd floor of office.
Loose Steps
Lifted and reattached front steps to commercial office to remove trip hazard.
Shower Room
Installation of shower benches and mirror.
Fire Escape
Replacement of treads on fire escape to comply with fire regulations.