Planned maintenance of conservatory roof glazing at an office. The main issue was a failure of the mastic seal that sealed the two glass units at the mid transom junction. We removed the existing mastic and re mastic pointed.
RECENT JOBS
Repaint edging of steps
Our preventative maintenance team attended a retail park in response to an issue raised in a health and safety review.
Graffiti removal
Our reactive maintenance team attended a business park in order to remove offensive graffiti and potential liable against ‘Jimmy ‘.
Repair of raised paving
Repair of raised paving
Reconstruction of fence
Our reactive team attended in order to repair a defective fence.
Installation of new roof hatches
Installation of new roof hatches
Installation of muster point post
Installation of muster point post