Planned maintenance of conservatory roof glazing at an office. The main issue was a failure of the mastic seal that sealed the two glass units at the mid transom junction. We removed the existing mastic and re mastic pointed.
RECENT JOBS
Installation of steel bollards
Installation of steel bollards to separate pedestrians at retail centre.
Installation of fabricated gate and fence
Fabrication of gates and fencing at industrial complex to enhance security as part of planned preventive maintenance programme.
Installation of LED floodlights
Electrical Installation of 6 LED floodlights at office complex as part of planned preventative maintenance programme.
Servicing and repair of entrance doors
Reactive servicing and repair of entrance doors to office to ensure security maintained.
Installation of speed bumps
Installation of speed bumps in office carpark as part of planned preventative maintenance following health and safety review
Cleaning and repair of shop front
Cleaning and repair of shop front of retail unit as part of reactive maintenance response.