Planned maintenance of conservatory roof glazing at an office. The main issue was a failure of the mastic seal that sealed the two glass units at the mid transom junction. We removed the existing mastic and re mastic pointed.
RECENT JOBS
Roof and gutters
There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate.
Installation of bollards
Our groundworks team attended a prestigious residential develop and installed suitable bollards to prevent unauthorised vehicle access.
Mold treatment & redecoration for retail unit
Our team attended retail unit that had been effected by mould and staining and redecorated.
Boiler Installation
Our plumbing and heating team attended a retail premises in order to install a boiler
Replacement of entry barrier
Our team urgently attended an industrial site due to a broken entrance barrier
Installation of fire exit
A 2 man team removed the existing structure to create a new fire exit.