Planned maintenance of conservatory roof glazing at an office. The main issue was a failure of the mastic seal that sealed the two glass units at the mid transom junction. We removed the existing mastic and re mastic pointed.
RECENT JOBS
Boarding Up
Emergency call out to board up broken window on 3rd floor of office.
Loose Steps
Lifted and reattached front steps to commercial office to remove trip hazard.
Shower Room
Installation of shower benches and mirror.
Fire Escape
Replacement of treads on fire escape to comply with fire regulations.