Our multi skilled team attended a commercial premises in order to fulfil a number of ‘handyman’ jobs in one visit highlighted in a health and safety assessment and tenant.
1 To highlight yellow step edges on the roof
2. Secure two ladders.
3. Paint yellow gas pipe located in the basement plant room
4. Decorated cracks around the door frame in man WC’s.
5. Roofer to investigate and repair two drains on the roof that are causing water ingress inside the building.
6. To attempt and isolate the water to the fire hose located in the basement and remove from site.
7. 2nd floor, tenants area: Electrician to attempt and replace a fuse that we suspect is causing the default. If light will need replacing we will provide an additional quote.
RECENT JOBS
Corona signage
Our preventive maintenance team attended a commercial premises in order to install signage to ensure that the site complied with health and safety guidance to prevent the corona.
Fire extinguisher installations
In response to a Fire risk Assessment our reactive maintenance team attended an industrial complex. They installed fire extinguishers and suitable signage through out the unit.
Hand sanitiser station
Or reactive team visited a commercial office in order to supply and instal a hand sanitiser station to ensure that the site complied with the Health and Safety guidance to combat the corona.
Signage to ensure building corona ready
Our reactive team attend a client site and fixed signage throughout the building to ensure compliance with all health and safety requirements prior to the premises being reoccupied post corona.
Corona Ready Office
Our reactive team visited a commercial office to install star signage, lift signage, screens and sanitiser stations.
Refurbishment of retail premises
Our refurbishment team attended a retail premises that was closed due to the corona.