Our multi skilled team attended a commercial premises in order to fulfil a number of ‘handyman’ jobs in one visit highlighted in a health and safety assessment and tenant.
1 To highlight yellow step edges on the roof
2. Secure two ladders.
3. Paint yellow gas pipe located in the basement plant room
4. Decorated cracks around the door frame in man WC’s.
5. Roofer to investigate and repair two drains on the roof that are causing water ingress inside the building.
6. To attempt and isolate the water to the fire hose located in the basement and remove from site.
7. 2nd floor, tenants area: Electrician to attempt and replace a fuse that we suspect is causing the default. If light will need replacing we will provide an additional quote.
RECENT JOBS
Repair of mag lock
Our locksmith attended commercial premises as the mag lock essential for security of the site had broken. The problem was fixed within 2 hours.
New street lights
Electrical installation team fitted 3 new 6 meter street lights in commercial office car park with LEDs. This included groundwork in order to install new electrical cabling for the lights.
Installation palisade fence
Planned maintenance team installed a fabricated palisade fence at an industrial site in order to enhance the security of the site.
Installation Aco drain
Groundworks team installed removed existing damaged drainage channel and installed new ACO drain.
Refurbishment of Fire Escape
As part of a planned maintenance schedule in response to a Fire Risk Assessment we cleaned , applied non slip finish , highlighted nosings, painted fire door and applied D-handle to fire escape and fire exit.
Door Frame Repair
Our carpentry team responded to a reactive maintenance request to repair the door frame of the ladies toilets in an office building.