Our multi skilled team attended a commercial premises in order to fulfil a number of ‘handyman’ jobs in one visit highlighted in a health and safety assessment and tenant.
1 To highlight yellow step edges on the roof
2. Secure two ladders.
3. Paint yellow gas pipe located in the basement plant room
4. Decorated cracks around the door frame in man WC’s.
5. Roofer to investigate and repair two drains on the roof that are causing water ingress inside the building.
6. To attempt and isolate the water to the fire hose located in the basement and remove from site.
7. 2nd floor, tenants area: Electrician to attempt and replace a fuse that we suspect is causing the default. If light will need replacing we will provide an additional quote.
RECENT JOBS
Outer Buildings Gutter Clean
Cleaning of gutters to prevent water ingress using spider boom and self propelled boom.
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.
Installation of Fire Doors
Installation of fire doors - SPA have a number of years experience of responding to Fire risk assessments and Health and Safety surveys.