Our groundworks team attended a retail centre due to a potential health and safety hazard. They lifted areas of raised paving – levelled the areas
– relayed the block paving ensuring no trip hazards and swept kiln sand in.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2020-04-07T09:02:05+02:00
Go to Top