Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Gully Replacement
A planned groundworks job to replace broken and loose gully slabs.
Refurbishment of Fire Exit
A planned maintenance job in response to a fire risk assessment.
Tarmac Repair
Planned maintenance in response to a health and safety review.
Clearing of Moss and Algae
Planned maintenance in response to health and safety review.
Groundworks Retail Park
Planned maintenance including groundworks, signage and drains.
Health and Safety Survey Response
Planned maintenance in response to a health and safety survey.









