Our refurbishment team attended and replaced missing plasterboard and filled as required and painted entire wall in white emulsion.

RECENT JOBS

  1. 1
  2. 2
  3. 3
  4. 4

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2020-01-23T20:40:51+02:00
Go to Top