Our planned maintenance team attended a commercial property to refurbish some of the outside areas. To attend site to carry out the following: removed tension wire and post for small fence, removed wires attached to the wall and removed damaged section of wall and slab. They then rebuilt the wall using new bricks, reinstalled slab, and reattached cables.
RECENT JOBS
Increased bike rack capacity
Our reactive team installed temporal bike parking in the carpark of a commercial building so that employees could avoid public transport during the corona
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.