Our planned maintenance team attended a commercial property to refurbish some of the outside areas. To attend site to carry out the following: removed tension wire and post for small fence, removed wires attached to the wall and removed damaged section of wall and slab. They then rebuilt the wall using new bricks, reinstalled slab, and reattached cables.
RECENT JOBS
Bollard Repair
Repair of damaged raised bollard.
Gutter Clearance
It is obviously important that gutters are kept clear in autumn to prevent water ingress.
Fire Strips
Installation of intumescent strips on fire doors post a Fire Risk assessment.
Refresh of external entrance areas
Pressure washing and sealing of cracks can give external areas an aesthetic uplift.
Rubbish Removal
It is important that fly tipping or other on site eye sores are removed as quickly as possible.