Our planned maintenance team attended a retina site and renewed the wooden knee rail fence. They then repaired the metal barrier attached to sub-station and finally replaced the area of damaged block paving and kerb stone to the left of sub-station which was a potential health and safety issue.
RECENT JOBS
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.
External envelope education extension
Cladding of new build extension . The unusual angles formed by the design were a challenge but the resulting effect was worthwhile.
Feature soffit and canopy commercial building
Installation of a new curved feature soffit and canopy to the entrance of this prestigious City building.
Kerb replacement
Our groundworks team attended an industrial site to dig and replace broken kerbs.
Adapting electric entrance barriers
To install switches into each car park barrier so they can be turned off individually.