Our planned maintenance team attended a retina site and renewed the wooden knee rail fence. They then repaired the metal barrier attached to sub-station and finally replaced the area of damaged block paving and kerb stone to the left of sub-station which was a potential health and safety issue.
RECENT JOBS
Kerb replacement
Our groundworks team attended an industrial site to dig and replace broken kerbs.
Adapting electric entrance barriers
To install switches into each car park barrier so they can be turned off individually.
Emergency lock replacement
Team attended a commercial building and identified, sourced and replaced lock.
Health and safety hazard repair
Our team attended an industrial park where some steps had become a Health and Safety hazard. Lifted , cleaned and relaid the slabs on a new bed of mortar and painted step nosings.
Removal of electric entrance barrier
Our reactive team were called to a retail park in order to remove an electric entrance barrier.
Main access door repair
Our team attended as a matter of urgency a commercial building where the main access doors had developed a problem.