Our planned maintenance team attended a retina site and renewed the wooden knee rail fence. They then repaired the metal barrier attached to sub-station and finally replaced the area of damaged block paving and kerb stone to the left of sub-station which was a potential health and safety issue.
RECENT JOBS
Installation of Gate
Fabrication and installation of new double leaf gate.
Pre-Christmas Refresh
Painting of bike racks and handrails ready for Christmas shopping at retail centre
Sign Clean
Cleaning of sign at entrance to industrial park.
Winter Preparations
In preparation for winter - drains cleared and over hanging trees branches cut back to prevent leaves falling into drains.
Emergency Repair
Emergency 2 hour repair to damaged height restrictor at Oxford retail park.
Bollard Repair
Repair of damaged raised bollard.








