Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Totem Refurbishment
Our maintenance team attend a retail site - removed old vinyls and replaced with new tenant vinyls on 3 totems - cleaned and removed graffiti
Security Signage
Our maintenance team attended a business park and installed security signage (CCTV in operation and private property) in order to ensure that 3rd parties were made aware upon visiting
Bollard Installation
Our groundworks team visited an industrial site in order to replace a bollard that had been damaged by an HGV.
Sign Refurbishment
Our reactive team attended an industrial site in order to refurbish a sign that had been the victim of a poor graffiti artist
Installation of bollards at retail site
Our groundworks team attended a retail site in West London.
Groundworks bollard installation
Our groundworks team attended a retail park.