Planned maintenanceRefurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.

RECENT JOBS

Glazing

Our glazing team attended a business centre in order to replace a large pane of commercial glass that had been damaged

2019-07-09T15:08:48+02:00
Go to Top