Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Repair of gas leak
Our reactive gas team attended a commercial building in order to attend a reported gas leak.
Repair of barrier and fence
Repair of barrier and fence in service yard
Replace water pump
Our reactive maintenance team attended a medical centre in order to replace bronze hot water circulator pump and vessel .
Flying response
Our flying response team attended a site in order to provide various accommodation options for birds and bugs who may be visiting.
Railing installation
Our preventative maintenance team attended a commercial premises in order to install a hand rail, the absence of which had been noted in a recent Health and Safety audit.
Electrical repair
Our reactive maintenance team attended a retail park due to lighting fault.