Planned maintenanceRefurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.

RECENT JOBS

Groundworks

Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.

Groundworks

Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.

Electrical

Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.

Glazing

Supplied and fitted toughened and laminated safety glass double glazed unit to office window.

2019-07-09T15:08:48+02:00
Go to Top