Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Fire stopping
Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment.
Replacement of glass on 3 story building
Our working at heights planned maintenance team cut out glazing from 3rd floor.
Refurbishment of fence rail / sub station and block paving
Our planned maintenance team attended a retina site and renewed the wooden knee rail fence...
Groundworks business centre
Our groundworks team attended site - lifted areas of dropped and risen block paving that had created a trip hazard in the car park...
External decoration of retail complex
Our planned maintenance team were asked to refresh and decorate a normally busy thoroughfare in a retail complex
Jet Washing
Our cleaning team attended a commercial building where the stairs leading from the car park had become both unsightly and a potential hazard.