Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Carpark repair
Our groundworks team attended a commercial building carpark to supply and fit water gullies.
Acyrpol roof repair
We attended a commercial building where client had reported splits appearing in the roof covering and intermittent problems with water ingress.
Fence repair
Our reactive maintenance team attended an office premises where a fence panel had been damaged in high winds.
Refurbishment of stairs and flooring
Our planned maintenance team attended a commercial office out of hours in order to relay a new carpet on the stairs and new flooring in entrance hall and bathrooms.
ACO channel replacement
Our groundworks team attended an industrial site in order to replace a heavy duty ACO S channel.
Retail carpet repair
Our reactive maintenance team attended a retail’s centre where a carpet had come loose and was presenting a potential heath and safety hazard