Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Preventing water ingress
Our commercial roofing team attended a Greater London commercial building to prevent water ingress
Fire Stopping
Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard.
Paving Replacement
Our groundworks team attended a retail centre due to a potential health and safety hazard.
Entrance door repairs
Our planned maintenance team attended a commercial building in Canary Wharf in order to service double glass doors which had not been operating correctly.
Carpark repair
Our groundworks team attended a commercial building carpark to supply and fit water gullies.
Acyrpol roof repair
We attended a commercial building where client had reported splits appearing in the roof covering and intermittent problems with water ingress.