Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Health and Safety Survey Response
Planned maintenance in response to a health and safety survey.
Groundworks and road lining
Planned maintenance at industrial park including groundworks, line marking and signage.
Decorating
Planned maintenance to decorate the lobby area of an office due to wear and tear.
Maintenance of conservatory roof glazing
Planned maintenance of conservatory roof glazing at an office
Refurbishment of office lavatories
Planned maintenance - Refurbishment of toilets in office due to rising damp.