Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Installation of Fire Doors
Installation of fire doors - SPA have a number of years experience of responding to Fire risk assessments and Health and Safety surveys.
Maintenance of Delivery Access
Servicing and maintenance of ground floor delivery doors including door adjustment , sealing strip to prevent heat loss and re positioning of gears.
Step Repair
Ensuring that all internal steps are in good order prevents Health and safety risks.
Clearing Roof
Clearing of debris from roof of commercial building preventing water ingress and damage.
Highlighting
Highlighting of potential hazards post a health and safety assessment.