Planned maintenanceRefurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.

RECENT JOBS

Bollards

Installation of bollards at commercial building - Bollards can be a fast and cost effective way of ensuring that tenant’s parking facilities aren’t used by 3rd parties.

2019-07-09T15:08:48+02:00
Go to Top