Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Step Repair
Ensuring that all internal steps are in good order prevents Health and safety risks.
Clearing Roof
Clearing of debris from roof of commercial building preventing water ingress and damage.
Highlighting
Highlighting of potential hazards post a health and safety assessment.
Installation of New Glass Canopy
Installation of new glass canopy over commercial building entrance.
Glass Pane
Emergency replacement of cracked pane of glass at commercial building.








