Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Fire Signs
Installation of fire signs - it is important that all fire signage is up to date and reflects current regulation
Paving Clean
Cleaning of external paving - we ensured that the external areas of the building reflected the quality of the interior.
Emergency Boarding Up
Boarding up of vacant retail outlet - The unauthorised access of vacant retail outlets can result in damage and insurance premium increases.
Repair of Bathroom Surface
Bathrooms are often the first impression visitors and potential tenants have of a building. We repaired surfaces to ensure reflected the quality of the building.
Smoking Bins
We attached smoking bins to prevent smokers gathering outside the entrance of a commercial building...
LED Lighting
Installation of LED lighting for MEES on industrial estate.