Our reactive maintenance team attended an industrial park in order to repair a gate that was unable to open – the gate also acts as a fire escape route and so was imperative that it worked. On attendance the team observed that the hinges had worn which had caused a misalignment. They made it operational again by removing one hinge packer and moving the bolt to keep it in the ground. We advised the client that it was probably worth replacing the hinges so that the same issue did not occur in the future.
RECENT JOBS
Repairs to prevent water ingress at retail outlet
Our preventative maintenance team attended a retail outlet on Oxford Street to investigate and carry out a roof repair due to water ingress.We applied aqua seal , plywood protection over the glazing and aluminium flashings to windows as well as cleaning gutters . Also EPDM used to reline the gutter and water outlet.
Malfunctioning Lock
Our reactive team responded to an urgent situation as the front door to a commercial office could not be closed due to a malfunctioning lock and presented a security risk . The lock was adjusted and the problem was resolved.
Refurbishment
Our refurbishment team attended and replaced missing plasterboard and filled as required and painted entire wall in white emulsion.
Brickwork Repair
Following the identification of a pillar in disrepair our reactive maintenance team attended site. They toothed out all broken brick work in the pillar and re-layed new bricks to rebuild the pillar.
Ground works post H&S review
Our groundwork team attended to repair broken paving slabs. This was following a heath and safety review which had identified them as slip hazards.
FRA Response
Our maintenance team attended a central London office to deal with recommendations post a Fire Risk Assessment. One of which was to relocate the fire extinguishers.