Our reactive maintenance team attended an industrial park in order to repair a gate that was unable to open – the gate also acts as a fire escape route and so was imperative that it worked. On attendance the team observed that the hinges had worn which had caused a misalignment. They made it operational again by removing one hinge packer and moving the bolt to keep it in the ground. We advised the client that it was probably worth replacing the hinges so that the same issue did not occur in the future.
RECENT JOBS
Take up decking – repair roof – clear gutters – replace decking
Take up decking - repair roof - clear gutters - replace decking.
Installation of roof railing
Installation of roof railing following health and safety review.
Installation of stair nosing
Installation of stair nosing at retail centre to prevent health and safety hazard.
Installation of floodlights and electrical testing
Installation of floodlights and electrical testing.
Replacement of Loose Slabs
Groundwork replacement of loose slabs at commercial office to prevent health and safety risk.
Filling of Pothole
Filling of pothole with cold tarmac to prevent trip hazard and standing water build up.