Our reactive maintenance team attended an industrial park in order to repair a gate that was unable to open – the gate also acts as a fire escape route and so was imperative that it worked. On attendance the team observed that the hinges had worn which had caused a misalignment. They made it operational again by removing one hinge packer and moving the bolt to keep it in the ground. We advised the client that it was probably worth replacing the hinges so that the same issue did not occur in the future.
RECENT JOBS
Roof and gutters
There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate.
Installation of bollards
Our groundworks team attended a prestigious residential develop and installed suitable bollards to prevent unauthorised vehicle access.
Mold treatment & redecoration for retail unit
Our team attended retail unit that had been effected by mould and staining and redecorated.
Boiler Installation
Our plumbing and heating team attended a retail premises in order to install a boiler
Replacement of entry barrier
Our team urgently attended an industrial site due to a broken entrance barrier
Installation of fire exit
A 2 man team removed the existing structure to create a new fire exit.