2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Groundworks and road lining
Planned maintenance at industrial park including groundworks, line marking and signage.
Decorating
Planned maintenance to decorate the lobby area of an office due to wear and tear.
Maintenance of conservatory roof glazing
Planned maintenance of conservatory roof glazing at an office
Refurbishment of office lavatories
Planned maintenance - Refurbishment of toilets in office due to rising damp.
Commercial Plumbing
Reactive maintenance response to blocked sinks in ladies bathroom.