Our planned maintenance team sent a 2 man team to an industrial park to break out damaged 3 kerb stones and 2 paving slabs that were a potential health and safety hazard and then supply and install 3 new kerb stones and 2x 600×900 paving slabs
RECENT JOBS
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.
Wall repair
Our groundworks team attended a commercial office building in Chelsea in order to repair a wall leading to the entrance of the building.
Electric access gate repairs
Our reactive team attended a retail park where the motorised access gates to the service yard were twisting as they opened.
Relaying trip hazards
Our groundworks team attended an industrial site where a health and safety report had indicated that some paving slabs were a potential trip hazard.
Faulty access door
Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door.